Home / Products / Diesel Forklifts / FS-G30-35

The three-tonne class, with the 3.5 t variant built on the same 2,810 mm chassis and 1,230 mm width. A 3,000 mm lift height reaches most racking levels, and the 480/510 mm/s lift speed keeps cycle times short on repetitive pallet work. Pneumatic 28×9-15 front tyres roll over gravel, cobbles and yard joints without the jarring ride of a cushion tyre, while wide-spaced mast channels preserve a clear view of the fork tips. Common settings are ports, timber merchants, brick works and general haulage depots.
| Manufacturer | FENGSONG | |
|---|---|---|
| Model | FS-G30 | FS-G35 |
| Rated capacity (kg) | 3000 | 3500 |
| Load centre (mm) | 500 | 500 |
| Power type | Diesel | Diesel |
| Service weight (kg) | 4300 | 4650 |
| Tire type | Pneumatic tyre | Pneumatic tyre |
| Front tire specifications | 28×9-15-14PR | 28×9-15-14PR |
| Rear tire specifications | 6.50-10-10PR | 6.50-10-10PR |
| Max. lift height H4 (mm) | 3000 | 3000 |
| Mast lowered height (mm) | 2125 | 2130 |
| Overhead guard height (mm) | 2130 | 2130 |
| Overall length (mm) | 2810 | 2810 |
| Overall width (mm) | 1230 | 1230 |
| Fork size (L*W*H) l/s/e (mm) | 1220×122×45 | 1220×122×50 |
| Min. ground clearance (mm) | 130 | 130 |
| Max travel speed (laden/unladen) (km/h) | 18.5/19 | 18.5/19 |
| Max lift speed (laden/unladen) (mm/s) | 480/510 | 480/510 |
| Engine manufacturer/model | Diesel engine, model confirmed at order | Diesel engine, model confirmed at order |
Specifications are indicative; final figures confirmed at order.
| MOQ | 1 unit |
|---|---|
| Payment | 30% T/T deposit, 70% balance before shipment; irrevocable L/C at sight above USD 30,000 |
| Lead time | 30–45 working days after deposit (standard models) |
| Warranty | 12 months / 2,000 hours on the machine |
| Container loading | On request (by model, mast, battery and packing) |
| Packing | Sea-freight export packing; masts detached and re-secured on arrival |
Send capacity, mast height and destination port — same-day FOB/CIF quotation with container loading plan.